This report assists managers in evaluating the parts in critical and high priority scenarios. The filters can be adjusted to select which planner(s) are included.
The team can then review what is causing parts to be in critical or red status over the time period and address manufacturing or purchasing constraints. Some planners may have parts categories with higher volatility, requiring the model to be fine-tuned for those. The report therefore helps to expose issues, enable bringing all parts into their desired zones, as well as preventing stock outs.
Comments
0 comments
Please sign in to leave a comment.